A place is being formed in 30 ft of water at spring tide, to be formed at neap tides, to be forwarded.

The expense of ten flights of steps is carried up in rough stones away with other places, the superintending being paid for by Government.

For the base of the steps, as the Praya work is filled in promiscuously by rubble, the above work will be executed in accordance with the plans and details formerly employed for other portions of the City, and the bottom @ 20 cents.

The peer referred to will be 79 feet in length, with a breadth of 12 feet, and a T head 20 feet by 10 feet, slightly modifying the original details.

The landing steps on either side of the seawall work will be 44 feet wide.

The steps will have landings of 20 feet, and will be six feet wide, two steps cut from one stone so as to make the work as durable as possible.

The amount voted by Council is $2000.

Coping stones: 4 lineal feet @ $2.46 = $9.84

Forward: $72 + $284 + $96 + $4 + $24 + $159 + $1624 = $1624

# $552.80 + $1624 = $2176.80, but the actual total shown is $1624.


Page information is not present in the original text, so it is not included.

has been rewritten to

A place is being formed in 30 ft of water at spring tide, to be formed at neap tides, to be forwarded.

The expense of ten flights of steps is carried up in rough stones as in other places, the superintending alone being paid for by Government.

For the base of the steps will be filled in promiscuously by 30 ft rubble.

The above work will be executed by Contract in accordance with the plans and details formerly employed for other portions of the City and the bottom @ 20 cents, as previously paid for the same things in other places.

The pier referred to will be 79 feet in length, 12 feet in breadth, with a T head 20 feet by 10 feet, slightly modifying the original details, masonry @ 20 cents.

The landing steps on either side of the seawall work will be 44 feet wide and 166 feet in total length.

The steps will have landings of 20 feet, and will be six feet wide, two steps cut from one stone so as to make the work as durable as possible. The amount voted by Council is $2000.

Coping stones dressing: 4 lineal feet @ $2.46 = $9.84, Forward: $72 + $284 + $96 + $4 + $159 = $615, adding $1624 ( possibly from previous page or calculation) = $1624.

# $552.80 + $1624 (some calculation not shown) = $2176.80 is not the focus, actual total shown is $1624.

Edit History

2026-05-19 05:00:30 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
A place is being formed in 30 ft of water at spring tide, to be formed at neap tides, to be forwarded. The expense of ten flights of steps is carried up in rough stones away with other places, the superintending being paid for by Government. For the base of the steps, as the Praya work is filled in promiscuously by rubble, the above work will be executed in accordance with the plans and details formerly employed for other portions of the City, and the bottom @ 20 cents. The peer referred to will be 79 feet in length, with a breadth of 12 feet, and a T head 20 feet by 10 feet, slightly modifying the original details. The landing steps on either side of the seawall work will be 44 feet wide. The steps will have landings of 20 feet, and will be six feet wide, two steps cut from one stone so as to make the work as durable as possible. The amount voted by Council is $2000. Coping stones: 4 lineal feet @ $2.46 = $9.84 Forward: $72 + $284 + $96 + $4 + $24 + $159 + $1624 = $1624 # $552.80 + $1624 = $2176.80, but the actual total shown is $1624. Page information is not present in the original text, so it is not included. has been rewritten to A place is being formed in 30 ft of water at spring tide, to be formed at neap tides, to be forwarded. The expense of ten flights of steps is carried up in rough stones as in other places, the superintending alone being paid for by Government. For the base of the steps will be filled in promiscuously by 30 ft rubble. The above work will be executed by Contract in accordance with the plans and details formerly employed for other portions of the City and the bottom @ 20 cents, as previously paid for the same things in other places. The pier referred to will be 79 feet in length, 12 feet in breadth, with a T head 20 feet by 10 feet, slightly modifying the original details, masonry @ 20 cents. The landing steps on either side of the seawall work will be 44 feet wide and 166 feet in total length. The steps will have landings of 20 feet, and will be six feet wide, two steps cut from one stone so as to make the work as durable as possible. The amount voted by Council is $2000. Coping stones dressing: 4 lineal feet @ $2.46 = $9.84, Forward: $72 + $284 + $96 + $4 + $159 = $615, adding $1624 ( possibly from previous page or calculation) = $1624. # $552.80 + $1624 (some calculation not shown) = $2176.80 is not the focus, actual total shown is $1624.
Baseline (Original)
d'at place is being formed in 30 ft of water at spring tide teforing tides, to Forward beformed. the expense often fights of steps It is carried up in rough stones awa with as in other other places, the sup sings. Oftevide superdings. alone being paid for by Government -- For blouise base of the steps will and as the Praya wor filled in promisquouely ļ by 30 Latian The above wolk will be executed Contract in ough rubble accordance with the plans and details formerly. employes for other portions of the City and the botim cyt @ 20 cto flamed at their at the's etes, paid for the same previously things in eplet The peer referred to will be 79 feet in length her 600 of 12 by a breadth of to fect, with a T hear 20 feet by 10% se ofe of and the slightly modeffing the original details 420 sonry @ 20 The Lending steps on either side of thead waarwork be 44 feet wede. steps 166 oftentia The steps will have lendings of 20 fut capting 3boc at Nullah and will be six and will be six feet ibide, two steps cut from one stone so as to make the work as de as possible amount voted a by Council is $2000. cofing stones Beressing 4 lineal 246 Forward 72 284 96 4 24-159 $1624 # 552 80 1624
2026-05-19 05:00:30 · Baseline
View content

d'at

place is being formed in 30 ft of water at spring tide

teforing tides, to Forward beformed.

the expense often fights of steps It is carried up in rough stones awa with

as in other

other places, the sup sings. Oftevide

superdings. alone being paid for by Government --

For blouise

base of the steps will and as the Praya wor filled in promisquouely

ļ

by

30

Latian

The above wolk will be executed Contract in ough rubble accordance with the plans and details formerly. employes for other portions of the City and the botim cyt @ 20 cto

flamed at their

at the's etes, paid for the same previously things in eplet

• The peer referred to will be 79 feet in length her 600 of 12 by a breadth of to fect, with a T hear 20 feet by 10% se ofe of and the slightly modeffing the original details

420

sonry @ 20

The Lending steps on either side of thead waarwork

be 44 feet

wede.

steps 166 oftentia

The steps will have lendings of 20 fut capting 3boc at Nullah and will be six

and will be six feet ibide, two steps cut from one stone so as to make the work as de

as possible amount voted

a by Council is $2000.

cofing stones Beressing

4 lineal 246

Forward

72

284

96

4

24-159

$1624

# 552 80 1624

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.